SUNSHINE BACKYARD POOLS - InstallationHAVING YOUR NEW SUNSHINE BACKYARD POOL INSTALLED
|
||||||||||||||
![]() |
9 am*: After the Pool Site has been excavated and leveled, construction of the bottom and top channels can begin. |
![]() |
10 am*: Then beach sand is put into place on the inside of the pool area. This protects the virgin liner and creates a comfortable base for you to walk on. |
![]() |
11 am*: The Massive supporting Aluminum Decks are assembled. |
![]() |
3 pm*: The pool walls and safety fence are assembled. |
![]() |
5 pm*: With the heavy virgin liner laid tightly in place, the final plumbing hookups are completed and the pool fills. |
|
|
Tomorrow the kids go Swimming! |
* The time table indicated above is an example of a 1 day installation however; each backyard is different and may require more time to complete installation depending on the yard and weather.